من نحن | البريد الإلكتروني: info@wolf-fix.com
ابحث عن وولفيكس، اعثر على المواد الجديدة المطلوبة
مشروع إعادة تأهيل مستشفى يوفو في جينان الصينية
معلومات المشروع الأساسية
وقت المشروع: Apr 2023.
منطقة المشروع: Jinan, China (Civil building)
المواد الرئيسية المستخدمة
1. نسيج ألياف الكربون >>اعرف المزيد
2. لاصق حقن الشقوق >>اعرف المزيد
3. لاصق تشريب الألياف المركبة >>اعرف المزيد
4. لاصق أساس >>اعرف المزيد

Background:


Jinan Youfu Hospital is a large-scale medical facility located in Jinan City, Shandong Province, China. The hospital was built in the 1980s and has been in operation for several decades. Over time, the hospital's infrastructure has deteriorated, and the facilities have become outdated, leading to decreased patient satisfaction and suboptimal outcomes.

Design Analysis:


Carbon fiber reinforced polymer (CFRP) , steel bonding, crack injection are common methods used in structural rehabilitation projects. CFRP is a lightweight, high-strength material that can be applied in thin layers to existing structures, providing additional support and increasing their load-bearing capacity. Steel bonding, on the other hand, involves attaching steel plates to the structure using epoxy adhesives or mechanical fasteners.

The use of carbon fiber and steel bonding in the rehabilitation of Jinan Youfu Hospital would depend on the specific structural issues identified during the analysis phase of the project. If the hospital's existing concrete structures are found to be weakened or damaged, strengthening work with CFRP or steel bonding could be a cost-effective and efficient solution to improve their strength and durability.

Conclusion:


If the rehabilitation plan for Jinan Youfu Hospital includes strengthening work with carbon fiber and steel bonding, it could be a valuable component of the overall project. However, it's important to carefully assess the structural issues and work closely with experts to ensure that the rehabilitation work is done safely and effectively.

المزيد من المشاريع ذات الصلة